Methodology

How we size treatment plants

Navbharat Water sizes each plant two ways and shows both: the book method, where every value traces to a published manual (CPHEEO 2013, Metcalf & Eddy 5th ed.), and NBW practice, our site experience, such as a 16-hour running day. Each stage, from screening to sludge, is calculated and its outlet quality checked against the applicable CPCB or SPCB norm.

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Two methods, one engine

Both methods run on every design and are reported side by side. Where an NBW practice value falls below a book safety limit, the report flags it.

TopicBook methodNBW practice
Running hoursUnits sized on average daily flow with peak factors for flow-sensitive units.Plant assumed to run 16 hours a day by default; equalisation covers the rest.
Equalisation tankSized from the inflow pattern to even out flow and load.Storage only (night inflow × 1.5). No treatment credit is taken for it.
MBBR tankSized from organic load and media surface loading.The larger of 6 hours retention and the media needed for BOD plus ammonia removal.
AerationOxygen demand from BOD and nitrification, corrected for site conditions.Fine-bubble diffusers in the biological tank; coarse bubble used for mixing only.
Anoxic tankSized from the nitrate to be removed and the denitrification rate.2 hours for high-strength sewage (labour camps, hostels, large commercial complexes), otherwise 1 hour.

NBW practice values are given here as principles and round figures. They are pending formal engineering sign-off and are not certified design values.

What is calculated at each stage

StageWhat is calculated
Screening / oil & grease trapPeak flow and approach velocity.
EqualisationStorage for the hours the plant is not running.
Biological (anoxic + MBBR, or SBR / MBR / extended aeration)Organic and ammonia load, media or tank volume, oxygen demand with denitrification credit.
SettlingTube settler or clarifier area from surface loading rate.
FiltrationSand and activated carbon filters from filtration rate and contact time.
DisinfectionChlorine dose and contact, or UV.
SludgeSludge quantity and holding volume.
Water qualityOutlet BOD, COD, TSS, ammonia, total nitrogen and oil & grease computed stage by stage and checked against the applicable discharge norm.

Inputs that change the answer

  • Daily flow and running hours.
  • Inlet quality. For sewage, if only BOD is known, COD is taken as 2 × BOD; industrial effluent needs both measured.
  • Minimum water temperature (biology) and maximum water and air temperature (aeration, blowers).
  • Discharge norm that applies (CPCB / SPCB consent, or reuse).
  • Site type (residential, hotel, hospital, commercial, industrial).

How designs are checked

  • Every design is checked against textbook worked examples and 70 published Indian and international designs (government DPRs, EIA reports, tenders and papers).
  • Rules are cross-checked against at least two public sources where possible.
  • A design stays "preliminary, not for construction" until a Navbharat Water engineer reviews and signs it.

Sources

  1. CPHEEO, Manual on Sewerage and Sewage Treatment Systems, Part A: Engineering, MoHUA, 2013.
  2. CPHEEO, Manual on Water Supply and Treatment, 3rd ed., 1999.
  3. Metcalf & Eddy / AECOM, Wastewater Engineering: Treatment and Resource Recovery, 5th ed., McGraw-Hill, 2014.
  4. Qasim, Motley and Zhu, Water Works Engineering: Planning, Design and Operation, Prentice Hall, 2000.
  5. US EPA, Fine Pore Aeration Systems design manual, EPA/625/1-89/023, 1989.
  6. DuPont Water Solutions, FilmTec Reverse Osmosis Membranes Technical Manual (form 45-D01504, current edition).
  7. MoEFCC notification G.S.R. 1265(E), 13 October 2017 (STP discharge standards).
  8. National Green Tribunal order of 30 April 2019 in O.A. 1069/2018 (stricter STP limits).
  9. Environment (Protection) Rules, 1986, Schedule VI (general discharge standards).
  10. IS 10500:2012, Drinking Water Specification.
  11. Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 (sludge and salt disposal).
  12. National Building Code of India 2016, Part 9 (water demand per person / bed), where used.

Frequently asked questions

What is the difference between the book method and NBW practice?

The book method follows published references such as the CPHEEO 2013 manual and Metcalf & Eddy, with every value traceable to a clause or table. NBW practice applies Navbharat Water site experience where it differs, for example a 16-hour running day and no treatment credit for the equalisation tank. Both are shown side by side, and any NBW value below a book safety limit is flagged.

Can a preliminary design be used for construction?

No. It is a preliminary estimate for budgeting and comparison. Detailed design and quotation are done by Navbharat Water engineers after a site visit and a lab analysis of the water.

How are the designs checked?

Every design is checked against textbook worked examples and 70 published Indian and international designs (government DPRs, EIA reports, tenders and papers). Rules are cross-checked against at least two public sources where possible.

Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.