STP, ETP and Water Treatment Guides

Plain-English guides to planning a sewage treatment plant in India: KLD meaning, how to calculate STP capacity, MBBR vs SBR vs MBR, cost drivers, CPCB/NGT discharge norms and when an STP is mandatory.

What does KLD mean?

KLD means kilolitres per day: 1 KLD = 1,000 litres a day = 1 m³/day. Convert KLD to LPH, m³/h and MLD, with the 24-hour and 16-hour running bases used for STP and RO plants.

How to calculate STP capacity in KLD

STP capacity (KLD) = persons × water supply per person (lpcd) × 0.8 ÷ 1,000. Worked example for a 100-flat society using CPHEEO water-supply rates and an 80% sewage factor.

MBBR vs SBR vs MBR compared

How MBBR, SBR and MBR sewage treatment plants work, and how they compare on area, power, operator skill, treated-water quality and reuse, with a guide to which suits which plant size.

How much does a sewage treatment plant cost in India?

What decides the cost of a sewage treatment plant in India: capacity, technology, inlet strength, tertiary treatment and reuse, civil vs packaged, site and scope. What a quotation should include and exclude.

Which STP outlet norms apply to my project?

STP outlet limits in India compared: EP Rules Schedule VI, MoEFCC 2017 (G.S.R. 1265(E)) and the NGT 2019 order (BOD 10, COD 50, TSS 20, total nitrogen 10). Which one applies, and what it means for the treatment train.

When is an STP mandatory for a building or factory?

When a sewage treatment plant is required in India: environmental clearance for buildings of 20,000 m² and above (EIA 2006, item 8(a)), consent to establish and operate under the Water Act 1974, CPCB 2025 categories, and local building rules.

How we size treatment plants

Our design method: book method (CPHEEO 2013, Metcalf & Eddy) side by side with NBW site practice, stage by stage, with the sources we cite.