STP capacity in KLD = number of persons × water supplied per person per day (litres) × 0.8 ÷ 1,000. CPHEEO recommends 135 litres per person per day for cities with sewerage and 150 for metro and mega cities; about 80% of the water supplied is commonly taken as sewage. A 100-flat society of 500 people at 135 litres needs about 54 KLD.
Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·
The formula
Sewage flow (KLD) = Population × Water supply rate (lpcd) × Sewage factor ÷ 1,000
| Input | Typical value | Source |
|---|---|---|
| Water supply rate, cities with piped water and sewerage | 135 litres per person per day (lpcd) | CPHEEO Manual on Water Supply and Treatment, 1999, Table 2.1 |
| Water supply rate, metropolitan and mega cities | 150 lpcd | CPHEEO Manual on Water Supply and Treatment, 1999, Table 2.1 |
| Sewage factor (share of water supplied that reaches the sewer) | 0.8 (80%) | Common Indian design assumption. CPHEEO 2013 (clause 3.5) notes it can range from 40% in arid areas to 90% in well-developed areas |
| Persons per flat | 5 (common planning assumption) | Use the actual occupancy if known |
Worked example: 100-flat housing society
- Population: 100 flats × 5 persons = 500 persons.
- Water supplied: 500 × 135 lpcd = 67,500 litres per day.
- Sewage generated: 67,500 × 0.8 = 54,000 litres per day.
- STP capacity: 54,000 ÷ 1,000 = 54 KLD.
In a metro city at 150 lpcd the same society generates 500 × 150 × 0.8 ÷ 1,000 = 60 KLD.
Same calculation for other society sizes
| Flats | Persons | KLD at 135 lpcd | KLD at 150 lpcd |
|---|---|---|---|
| 25 | 125 | 13.5 | 15 |
| 50 | 250 | 27 | 30 |
| 100 | 500 | 54 | 60 |
| 150 | 750 | 81 | 90 |
| 200 | 1000 | 108 | 120 |
| 300 | 1500 | 162 | 180 |
| 500 | 2500 | 270 | 300 |
Buildings other than housing
For hotels and hospitals, start from the water demand per bed in the CPHEEO Sewerage Manual 2013, Table 3.4 (shown below), then apply the same sewage factor. Hospitals, hotels and kitchens also need an oil and grease trap ahead of the STP. Add separate streams (laundry, kitchen, cooling-tower blowdown) only if they drain to the STP.
| Building | Water demand |
|---|---|
| Hospital, up to 100 beds | 340 litres per bed per day |
| Hospital, above 100 beds | 450 litres per bed per day |
| Hotel | 180 litres per bed per day |
| Hostel | 135 litres per person per day |
Peak factor (for pipes, screens and pumps)
| Contributory population | Peak factor |
|---|---|
| Up to 20,000 | 3.00 |
| 20,001 to 50,000 | 2.50 |
| 50,001 to 7,50,000 | 2.25 |
| Above 7,50,000 | 2.00 |
From average flow to the plant size you buy
- Design margin (NBW practice): Navbharat Water adds a margin for future occupancy and day-to-day variation, then rounds up to a standard plant size. This is our practice, not a CPHEEO rule; ask any vendor to state the margin they used.
- Running hours: a plant that runs 16 hours a day treats the daily volume at a higher hourly rate than one running 24 hours (see KLD meaning).
- Peak flow: screens and pumps are checked for the peak hourly flow, not just the daily average.
- Inlet strength: high-strength sewage (labour camps, hostels, large commercial complexes) changes the tank sizes but not the KLD.
This page calculates the sewage flow only. Tank sizes, area and power depend on the technology and inlet quality; see our design method and MBBR vs SBR vs MBR.
Frequently asked questions
What is the formula for STP capacity?
STP capacity (KLD) = population × water supply rate (litres per person per day) × 0.8 ÷ 1,000, where 0.8 is the commonly used sewage factor (the share of water supplied that reaches the sewer).
What size STP does a 100-flat society need?
At 5 persons per flat and 135 litres per person per day, about 54 KLD of sewage (60 KLD at the 150-litre metro rate), before the design margin and rounding to a standard plant size.
Why is sewage taken as 80% of water supply?
Part of the water supplied is used for gardening, washing vehicles, evaporation and other uses that do not reach the sewer. 80% is a common Indian design value; the CPHEEO Sewerage Manual 2013 notes the share can range from about 40% in arid areas to 90% in well-developed areas, so use local data where you have it.
Sources
- CPHEEO, Manual on Water Supply and Treatment, 3rd ed., 1999.
- CPHEEO, Manual on Sewerage and Sewage Treatment Systems, Part A: Engineering, MoHUA, 2013.