An STP's cost depends mainly on its capacity in KLD, the technology (MBBR, SBR or MBR), how strong the sewage is, whether the water is reused, and packaged vs civil construction. Published market figures put a 100 KLD MBBR STP at about ₹28 L – ₹50 L turnkey, excluding GST, land and civil building; cost per KLD falls as plants get bigger.

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Typical market price ranges by capacity

Typical market range (published figures, 2026) — not an NBW quotation

CAPEX, turnkey plant. ±30%. Excludes GST, land, civil building and site work.
CapacitySTP — MBBRSTP — SBRSTP — MBR
10 KLD₹6 L – ₹10 L₹7 L – ₹13 L₹10 L – ₹16 L
25 KLD₹11 L – ₹18 L₹12 L – ₹22 L₹20 L – ₹32 L
50 KLD₹18 L – ₹30 L₹20 L – ₹37 L₹35 L – ₹50 L
100 KLD₹28 L – ₹50 L₹31 L – ₹62 L₹55 L – ₹90 L
200 KLD₹55 L – ₹90 L₹60 L – ₹1.1 Cr₹1 Cr – ₹1.6 Cr
500 KLD₹1.3 Cr – ₹2.2 Cr₹1.4 Cr – ₹2.7 Cr₹2.5 Cr – ₹4.2 Cr
1,000 KLD₹2.5 Cr – ₹4 Cr₹2.7 Cr – ₹4.9 Cr₹4.5 Cr – ₹8 Cr
Running cost (O&M) per KL treated: power, chemicals, manpower, sludge and AMC/membranes. Typical market range (published figures, 2026) — not an NBW quotation.
CapacitySTP — MBBRSTP — SBRSTP — MBR
10 KLD₹30 – 50 per KL₹32 – 55 per KL₹45 – 75 per KL
25 KLD₹20 – 35 per KL₹22 – 38 per KL₹30 – 50 per KL
50 KLD₹14 – 26 per KL₹15 – 28 per KL₹22 – 38 per KL
100 KLD₹10 – 22 per KL₹11 – 24 per KL₹16 – 30 per KL
200 KLD₹8 – 16 per KL₹9 – 18 per KL₹13 – 24 per KL
500 KLD₹6 – 12 per KL₹7 – 13 per KL₹10 – 18 per KL
1,000 KLD₹5 – 10 per KL₹6 – 11 per KL₹8 – 15 per KL

These are published market figures, not Navbharat Water's prices. For our own estimate for your project, request a quote.

Ranges are compiled from published Indian market figures and interpolated between capacities. They cover a turnkey plant: equipment, standard tankage, electricals, installation and commissioning to discharge norms. MBR figures exclude downstream RO; reuse polishing and pipelines outside the plant are extra for all three.

What drives the price

Cost driverHow it changes the price
Capacity (KLD)Bigger plants cost more in total but less per KLD (economies of scale).
TechnologyMBBR is usually the lowest-cost option; SBR adds PLC cycle control and decanters; MBR adds membranes and costs the most to build and run.
Inlet strengthHigh-strength sewage (labour camps, hostels, kitchens) needs bigger biological tanks and more air.
Discharge or reuse normStricter outlet limits (low BOD, total nitrogen) and reuse for flushing or HVAC add anoxic, tertiary or UF/RO stages.
Packaged vs civilPackaged FRP/MS units are faster to install; civil RCC tanks suit larger plants. Underground or basement plants add civil and ventilation cost.
Running hoursA plant designed to run fewer hours needs larger equalisation storage and higher-rated equipment.
Site and scopeDistance, access, power supply, sludge handling, odour control and the O&M contract all change the quote.

What a quotation should include

  • Process design basis: flow, running hours, inlet quality and the outlet norm the plant is guaranteed to meet.
  • Equipment list with makes: blowers, pumps, diffusers, media or membranes, filters, dosing, panel.
  • Tankage (packaged or civil) and who builds it.
  • Installation, testing, commissioning and operator training.
  • Warranty, and the O&M or AMC terms after handover.

What quotes often exclude

  • GST.
  • Civil works, plant-room building, excavation and dewatering.
  • Land, approvals and SPCB consent fees.
  • Reuse polishing (UF/RO) and treated-water pipelines outside the plant.
  • Power supply up to the plant panel, and diesel generator backup.

Check your SPCB consent first

The outlet norm in your consent decides the treatment train, and the train decides the price. Get the norm in writing before comparing quotes, and compare vendors on the same flow, running hours, inlet and outlet basis. See STP norms and is an STP mandatory.

Not sure of your capacity? Calculate it in KLD. For Navbharat Water's own estimate for your project, request a quote: you get a preliminary design and an indicative market range, then a detailed quotation from our engineers.

Frequently asked questions

Why does STP cost per KLD go down as the plant gets bigger?

Many costs (panel, controls, blowers, engineering, commissioning) do not grow in proportion to capacity, so a larger plant spreads them over more KLD.

Is MBR more expensive than MBBR?

Usually yes, to build and to run, because of the membranes, permeate pumps and air scouring. It saves area and gives reuse-quality water, which can offset the cost where space is expensive or water is reused.

Does an STP quotation include civil work?

Often not. Many quotes cover equipment, installation and commissioning only. Ask whether tanks, the plant room, excavation and GST are included.

Sources

  1. CPHEEO, Manual on Sewerage and Sewage Treatment Systems, Part A: Engineering, MoHUA, 2013.

Related guides

Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.

How we calculate: our design method and sources. For a detailed quotation, request a quote.