Skip to main content

Effluent treatment plants by industry

Effluent treatment plant for dairy

This physico-chemical + MBBR effluent treatment plant for dairy is sized at a sample flow of 100 KLD. Plot about 22.3 × 25.4 m (566 m²). Power: 38.2 kW connected, about 324 kWh a day. Computed outlet meets EP Rules Sch I Sl. 56 (dairy) for the parameters computed (BOD, TSS, Oil & grease). Not computed here: pH and waste water generation; checked in detailed design. Budget: on request.

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Design summary

ItemValue
Design flow100 KLD
Flow over running hours6.25 m³/h (16 h/day)
Flow averaged over 24 h4.17 m³/h
Technologyphysico-chemical + MBBR
Plot (footprint)22.3 × 25.4 m (566 m²)
Connected load38.2 kW
Operating load20.2 kW
Energy per day324 kWh
Energy per m³3.24 kWh/m³
Blower air (all duty blowers)401 Nm³/h
Design methodNBW practice

Treatment units and sizes

UnitPurposeVolumeSizeSizing basis
Equalisation tankstores and evens out the inflow50.5 m³3.8 × 3.8 × 3.5 mstores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit
Neutralisation tankcorrects the pH1.1 m³1 × 1.05 × 1.01 mpH correction to 7.5
Flash mixermixes in the coagulant0.6 m³0.8 × 0.8 × 1 mcoagulant mixing
Flocculatorgrows the flocs for settling2.2 m³1.3 × 1.3 × 1.28 mflocculation with polyelectrolyte
DAF tankfloats off oil, fat and fine solids2.6 m³1.6 × 0.8 × 2 mdissolved air flotation: oil, fat and fine solids; BOD credit 30 % (published 28-66 %), confirmed by jar test in detailed design
MBBR tank, 2 stages (sieve baffle)biological treatment: BOD and ammonia removal127 m³6 × 6.05 × 3.5 mlarger of 6 h on the running flow and the tank for the media needed for BOD + ammonia removal; media 50.6 m3 (40 % fill), 2 stages, fine-bubble air
Secondary clarifier (hopper bottom)settles the biological sludge25.2 m³2.9 × 2.9 × 3 mclarifier by surface loading, 6.1 h
Chlorine contact tankdisinfection (chlorine contact)2.1 m³1.35 × 0.45 × 3.5 mchlorine contact on the running flow
Pressure sand filter, FRP 30x72 inchremoves suspended solidsØ 0.76 m × 1.83 m high4.2 m3/h at 9.1 m/h filtration velocity
Activated carbon filter, FRP 36x72 inchremoves colour, odour and chlorineØ 0.91 m × 1.83 m high4.2 m3/h at 6.3 m/h filtration velocity
Treated water tankstores the treated water33.6 m³3.1 × 3.1 × 3.5 mtreated water storage, about 8 h of average flow
Sludge holding tankholds the excess sludge58.1 m³4.05 × 4.1 × 3.5 mabout 7 days of sludge, air mixed
Filter press, 800 x 800 mm, 32 chambersdewaters the sludge to cake800 mm plates, 32 chambers, 476 kg/d wet cake
Twin lobe air blowerair for aeration and mixing401 Nm3/h at 4.5 m water column, 1 working + 1 standby (serves eq, mbbr, sludge)

Tank sizes are length × width × depth; vessel sizes are diameter × height.

Water quality, stage by stage

mg/L, computed.
StageBODCODTSSNH₃-NTotal NOil & grease
Inlet1,5002,5006008080200
Basket screen (inlet chamber)1,5002,5006008080200
Equalisation tank1,5002,5006008080200
Neutralisation tank1,5002,5006008080200
Flash mixer1,5002,5006008080200
Flocculator1,5002,5006008080200
Dissolved air flotation (DAF)1,0501,795150808010
MBBR bioreactor52.5232.3150142.62
Secondary clarifier44.6219.930142.62
Disinfection44.6219.930142.62
Pressure sand filter33.5202.415142.62
Activated carbon filter21.8131.615142.62
Outlet21.8131.615142.62

Outlet vs EP Rules Sch I Sl. 56 (dairy)

EP Rules 1986 Sch. I Sl. 56, dairy (G.S.R. 475(E), 1992), inland surface water. Source: Sch. I Sl. 56, ins. by G.S.R. 475(E) dated 05-05-1992. Applies to: inland surface water (the board may tighten BOD to 30 where the water is a drinking-water source). mg/L.
ParameterLimitComputed outletResult
BOD≤ 10021.8Within limit
TSS≤ 15015Within limit
Oil & grease≤ 102Within limit

Not computed in this estimate — checked in detailed design:

  • pH 6.5-8.5
  • waste water generation 3 m3 per kL of milk

Design assumptions

  • Raw inlet BOD 1,500 mg/L
  • Raw inlet COD 2,500 mg/L
  • Raw inlet TSS 600 mg/L
  • Raw inlet TKN 80 mg/L
  • Raw inlet oil and grease 200 mg/L
  • Raw inlet pH 6.5
  • Raw TDS 1,500 mg/L
  • Design temperature 15–32 °C
  • Checked against: EP Rules Sch I Sl. 56 (dairy)
  • Plant running 16 hours a day
  • Flow basis: about 1-3 m3 per kL of milk processed
  • Discharge assumed: inland surface water (assumed; the consent decides)
  • Inlet quality: ASSUMED typical values from published ranges for the industry; the plant is designed on the unit's own lab report
  • Note: fat removal (DAF) ahead of the biology

Design checks

  • screen type: a channel bar screen reaches only 0.28 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead
  • alkalinity after nitrification (before dosing): short of alkalinity: NaHCO3 dosed to keep pH >= 6.8

Budget

On request. Ask for a budget estimate for your site.

What quotes often exclude

  • GST
  • Land and civil building / shed
  • Site work: excavation, piling, dewatering
  • Power connection up to the plant panel
  • Consent (CTE / CTO) fees and liaison
  • Operation and maintenance after commissioning

Check your SPCB consent

The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.

Frequently asked questions

What size of tanks does a 100 KLD dairy ETP need?

About 303 m3 of tanks in all: equalisation tank 50.5 m3; neutralisation tank 1.1 m3; flash mixer 0.6 m3; flocculator 2.2 m3; daf tank 2.6 m3; mbbr tank 127 m3; secondary clarifier (hopper bottom) 25.2 m3; chlorine contact tank 2.1 m3; treated water tank 33.6 m3; sludge holding tank 58.1 m3.

How much space and power does a 100 KLD dairy ETP need?

A plot about 22.3 x 25.4 m including the equipment room; 38.2 kW connected, 20.2 kW running, about 324 kWh a day (3.24 kWh per m3) at 16 h a day.

Does a 100 KLD dairy ETP meet the dairy standard (EP Rules Sch. I Sl. 56)?

Computed outlet BOD 21.8, TSS 15 mg/L against the dairy standard (EP Rules Sch. I Sl. 56) BOD 100, TSS 150 mg/L: within the limits. Its other parameters (pH and those listed on this page) are not computed in this estimate; checked in detailed design.

Related

Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.

How we calculate: our design method and sources. For a detailed quotation, request a quote.