This physico-chemical effluent treatment plant for electroplating / engineering is sized at a sample flow of 20 KLD. Plot about 17.7 × 12.6 m (223 m²). Power: 12.6 kW connected, about 150 kWh a day. Computed outlet meets EP Rules Sch I Sl. 9 (electroplating) for the parameters computed (TSS, Oil & grease, NH₃-N). Not computed here: pH, temperature not over, total metal and 14 more; checked in detailed design. Budget: on request.

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Design summary

ItemValue
Design flow20 KLD
Flow over running hours1.25 m³/h (16 h/day)
Flow averaged over 24 h0.83 m³/h
Technologyphysico-chemical
Plot (footprint)17.7 × 12.6 m (223 m²)
Connected load12.6 kW
Operating load10.3 kW
Energy per day150 kWh
Energy per m³7.49 kWh/m³
Blower air (all duty blowers)22 Nm³/h
Design methodNBW practice

Treatment units and sizes

UnitPurposeVolumeSizeSizing basis
Oil and grease trapremoves floating oil and grease1.3 m³1.2 × 1.2 × 0.9 moil and grease trap at the peak inflow
Equalisation tankstores and evens out the inflow10.2 m³1.85 × 1.9 × 2.9 mstores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit
Batch reactor A (neutralise, precipitate, flocculate)corrects the pH12.3 m³1.85 × 1.9 × 3.5 m
Batch reactor B (neutralise, precipitate, flocculate)corrects the pH12.3 m³1.85 × 1.9 × 3.5 m
Tube settler (hopper bottom)settles the chemical sludge6.1 m³1.4 × 1.4 × 3.1 mchemical sludge settling by surface loading
Chlorine contact tankdisinfection (chlorine contact)1.7 m³1.2 × 1.2 × 1.2 mchlorine contact on the running flow
Pressure sand filter, FRP 24x72 inchremoves suspended solidsØ 0.61 m × 1.83 m high3.3 m3/h at 11.4 m/h filtration velocity
Activated carbon filter, FRP 36x72 inchremoves colour, odour and chlorineØ 0.91 m × 1.83 m high3.3 m3/h at 5.1 m/h filtration velocity
Treated water tankstores the treated water6.7 m³1.45 × 1.45 × 3.2 mtreated water storage, about 8 h of average flow
Sludge holding tankholds the excess sludge4.3 m³1.25 × 1.25 × 2.75 mabout 7 days of sludge, air mixed
Filter press, 470 x 470 mm, 7 chambersdewaters the sludge to cake470 mm plates, 7 chambers, 30 kg/d wet cake
Twin lobe air blowerair for aeration and mixing22 Nm3/h at 3.9 m water column, 1 working + 1 standby (serves eq, sludge)

Tank sizes are length × width × depth; vessel sizes are diameter × height.

Water quality, stage by stage

mg/L, computed.
StageBODCODTSSNH₃-NTotal NOil & grease
Inlet40250200101020
Basket screen (inlet chamber)40250200101020
Oil and grease trap38238.220010108
Equalisation tank38238.220010108
Neutralisation / precipitation reactors (batch)38238.220010108
Tube settler (chemical sludge)38238.210010108
Disinfection38238.210010108
Pressure sand filter28.5182.45010108
Activated carbon filter18.5118.65010108
Outlet18.5118.65010108

Outlet vs EP Rules Sch I Sl. 9 (electroplating)

EP Rules 1986 Sch. I Sl. 9, electroplating and anodizing (G.S.R. 266(E), 2012). Source: Sch. I Sl. 9, subs. by G.S.R. 266(E) dated 30-03-2012. Applies to: not stated in the entry (applies to all discharge). mg/L.
ParameterLimitComputed outletResult
TSS≤ 10050Within limit
Oil & grease≤ 108Within limit
NH₃-N≤ 5010Within limit

Not computed in this estimate — checked in detailed design:

  • pH 6.0-9.0
  • temperature not over 5 C above the receiving water
  • total metal (Zn+Cu+Ni+Al+Fe+Cr+Cd+Pb+Sn+Ag) 10 mg/L
  • trichloroethane 0.1 mg/L
  • trichloroethylene 0.1 mg/L
  • nickel 3 mg/L
  • hexavalent chromium 0.1 mg/L
  • total chromium 2 mg/L
  • copper 3 mg/L
  • zinc 5 mg/L
  • lead 0.1 mg/L
  • iron 3 mg/L
  • cyanide 0.2 mg/L
  • total residual chlorine 1 mg/L
  • sulphide 2 mg/L
  • sulphate 400 mg/L
  • phosphate (as P) 5 mg/L

Design assumptions

  • Raw inlet BOD 40 mg/L
  • Raw inlet COD 250 mg/L
  • Raw inlet TSS 200 mg/L
  • Raw inlet TKN 10 mg/L
  • Raw inlet oil and grease 20 mg/L
  • Raw inlet pH 3
  • Raw TDS 3,000 mg/L
  • Design temperature 15–32 °C
  • Checked against: EP Rules Sch I Sl. 9 (electroplating)
  • Plant running 16 hours a day
  • Flow basis: rinse water, about 1-5 m3 per shift per line
  • Discharge assumed: inland surface water (assumed; the consent decides)
  • Inlet quality: ASSUMED typical values from published ranges for the industry; the plant is designed on the unit's own lab report
  • Note: metal hydroxide sludge is hazardous waste (TSDF); hexavalent chromium needs reduction first (not sized here)

Design checks

  • screen type: a channel bar screen reaches only 0.06 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead
  • Filter press feed pump (AODD): delivery velocity (DN15): flow too small for the smallest pipe to reach 0.6 m/s; accept or run the pump on a timer at a higher velocity

Engineering notes

Points our engineers confirm during detailed design:

  • acidity titrated: pH alone misses the HSO4- / metal buffering: lime, sludge and RO feed TDS are lower bounds until the free acidity is titrated
  • Chemical sludge (metal hydroxides / pickling) is hazardous waste (HOWM Rules 2016 Sch. I): cake to a TSDF with manifest; disposal in the exclusions

Budget

On request. Ask for a budget estimate for your site.

What quotes often exclude

  • GST
  • Land and civil building / shed
  • Site work: excavation, piling, dewatering
  • Power connection up to the plant panel
  • Consent (CTE / CTO) fees and liaison
  • Operation and maintenance after commissioning

Check your SPCB consent

The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.

Frequently asked questions

What size of tanks does a 20 KLD electroplating / engineering ETP need?

About 55 m3 of tanks in all: oil and grease trap 1.3 m3; equalisation tank 10.2 m3; batch reactor a (neutralise 12.3 m3; batch reactor b (neutralise 12.3 m3; tube settler (hopper bottom) 6.1 m3; chlorine contact tank 1.7 m3; treated water tank 6.7 m3; sludge holding tank 4.3 m3.

How much space and power does a 20 KLD electroplating / engineering ETP need?

A plot about 17.7 x 12.6 m including the equipment room; 12.6 kW connected, 10.3 kW running, about 150 kWh a day (7.49 kWh per m3) at 16 h a day.

Does a 20 KLD electroplating / engineering ETP meet the electroplating standard (EP Rules Sch. I Sl. 9)?

Computed outlet BOD 18.5, COD 118.6, TSS 50 mg/L against the electroplating standard (EP Rules Sch. I Sl. 9) TSS 100 mg/L: within the limits. Its other parameters (pH and those listed on this page) are not computed in this estimate; checked in detailed design.