Effluent treatment plants by industry
Effluent treatment plant for electroplating / engineering
This physico-chemical effluent treatment plant for electroplating / engineering is sized at a sample flow of 20 KLD. Plot about 17.7 × 12.6 m (223 m²). Power: 12.6 kW connected, about 150 kWh a day. Computed outlet meets EP Rules Sch I Sl. 9 (electroplating) for the parameters computed (TSS, Oil & grease, NH₃-N). Not computed here: pH, temperature not over, total metal and 14 more; checked in detailed design. Budget: on request.
Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·
Design summary
| Item | Value |
|---|---|
| Design flow | 20 KLD |
| Flow over running hours | 1.25 m³/h (16 h/day) |
| Flow averaged over 24 h | 0.83 m³/h |
| Technology | physico-chemical |
| Plot (footprint) | 17.7 × 12.6 m (223 m²) |
| Connected load | 12.6 kW |
| Operating load | 10.3 kW |
| Energy per day | 150 kWh |
| Energy per m³ | 7.49 kWh/m³ |
| Blower air (all duty blowers) | 22 Nm³/h |
| Design method | NBW practice |
Treatment units and sizes
| Unit | Purpose | Volume | Size | Sizing basis |
|---|---|---|---|---|
| Oil and grease trap | removes floating oil and grease | 1.3 m³ | 1.2 × 1.2 × 0.9 m | oil and grease trap at the peak inflow |
| Equalisation tank | stores and evens out the inflow | 10.2 m³ | 1.85 × 1.9 × 2.9 m | stores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit |
| Batch reactor A (neutralise, precipitate, flocculate) | corrects the pH | 12.3 m³ | 1.85 × 1.9 × 3.5 m | |
| Batch reactor B (neutralise, precipitate, flocculate) | corrects the pH | 12.3 m³ | 1.85 × 1.9 × 3.5 m | |
| Tube settler (hopper bottom) | settles the chemical sludge | 6.1 m³ | 1.4 × 1.4 × 3.1 m | chemical sludge settling by surface loading |
| Chlorine contact tank | disinfection (chlorine contact) | 1.7 m³ | 1.2 × 1.2 × 1.2 m | chlorine contact on the running flow |
| Pressure sand filter, FRP 24x72 inch | removes suspended solids | Ø 0.61 m × 1.83 m high | 3.3 m3/h at 11.4 m/h filtration velocity | |
| Activated carbon filter, FRP 36x72 inch | removes colour, odour and chlorine | Ø 0.91 m × 1.83 m high | 3.3 m3/h at 5.1 m/h filtration velocity | |
| Treated water tank | stores the treated water | 6.7 m³ | 1.45 × 1.45 × 3.2 m | treated water storage, about 8 h of average flow |
| Sludge holding tank | holds the excess sludge | 4.3 m³ | 1.25 × 1.25 × 2.75 m | about 7 days of sludge, air mixed |
| Filter press, 470 x 470 mm, 7 chambers | dewaters the sludge to cake | 470 mm plates, 7 chambers, 30 kg/d wet cake | ||
| Twin lobe air blower | air for aeration and mixing | 22 Nm3/h at 3.9 m water column, 1 working + 1 standby (serves eq, sludge) |
Tank sizes are length × width × depth; vessel sizes are diameter × height.
Water quality, stage by stage
| Stage | BOD | COD | TSS | NH₃-N | Total N | Oil & grease |
|---|---|---|---|---|---|---|
| Inlet | 40 | 250 | 200 | 10 | 10 | 20 |
| Basket screen (inlet chamber) | 40 | 250 | 200 | 10 | 10 | 20 |
| Oil and grease trap | 38 | 238.2 | 200 | 10 | 10 | 8 |
| Equalisation tank | 38 | 238.2 | 200 | 10 | 10 | 8 |
| Neutralisation / precipitation reactors (batch) | 38 | 238.2 | 200 | 10 | 10 | 8 |
| Tube settler (chemical sludge) | 38 | 238.2 | 100 | 10 | 10 | 8 |
| Disinfection | 38 | 238.2 | 100 | 10 | 10 | 8 |
| Pressure sand filter | 28.5 | 182.4 | 50 | 10 | 10 | 8 |
| Activated carbon filter | 18.5 | 118.6 | 50 | 10 | 10 | 8 |
| Outlet | 18.5 | 118.6 | 50 | 10 | 10 | 8 |
Outlet vs EP Rules Sch I Sl. 9 (electroplating)
| Parameter | Limit | Computed outlet | Result |
|---|---|---|---|
| TSS | ≤ 100 | 50 | Within limit |
| Oil & grease | ≤ 10 | 8 | Within limit |
| NH₃-N | ≤ 50 | 10 | Within limit |
Not computed in this estimate — checked in detailed design:
- pH 6.0-9.0
- temperature not over 5 C above the receiving water
- total metal (Zn+Cu+Ni+Al+Fe+Cr+Cd+Pb+Sn+Ag) 10 mg/L
- trichloroethane 0.1 mg/L
- trichloroethylene 0.1 mg/L
- nickel 3 mg/L
- hexavalent chromium 0.1 mg/L
- total chromium 2 mg/L
- copper 3 mg/L
- zinc 5 mg/L
- lead 0.1 mg/L
- iron 3 mg/L
- cyanide 0.2 mg/L
- total residual chlorine 1 mg/L
- sulphide 2 mg/L
- sulphate 400 mg/L
- phosphate (as P) 5 mg/L
Design assumptions
- Raw inlet BOD 40 mg/L
- Raw inlet COD 250 mg/L
- Raw inlet TSS 200 mg/L
- Raw inlet TKN 10 mg/L
- Raw inlet oil and grease 20 mg/L
- Raw inlet pH 3
- Raw TDS 3,000 mg/L
- Design temperature 15–32 °C
- Checked against: EP Rules Sch I Sl. 9 (electroplating)
- Plant running 16 hours a day
- Flow basis: rinse water, about 1-5 m3 per shift per line
- Discharge assumed: inland surface water (assumed; the consent decides)
- Inlet quality: ASSUMED typical values from published ranges for the industry; the plant is designed on the unit's own lab report
- Note: metal hydroxide sludge is hazardous waste (TSDF); hexavalent chromium needs reduction first (not sized here)
Design checks
- screen type: a channel bar screen reaches only 0.06 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead
- Filter press feed pump (AODD): delivery velocity (DN15): flow too small for the smallest pipe to reach 0.6 m/s; accept or run the pump on a timer at a higher velocity
Engineering notes
Points our engineers confirm during detailed design:
- acidity titrated: pH alone misses the HSO4- / metal buffering: lime, sludge and RO feed TDS are lower bounds until the free acidity is titrated
- Chemical sludge (metal hydroxides / pickling) is hazardous waste (HOWM Rules 2016 Sch. I): cake to a TSDF with manifest; disposal in the exclusions
Budget
On request. Ask for a budget estimate for your site.
What quotes often exclude
- GST
- Land and civil building / shed
- Site work: excavation, piling, dewatering
- Power connection up to the plant panel
- Consent (CTE / CTO) fees and liaison
- Operation and maintenance after commissioning
Check your SPCB consent
The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.
Frequently asked questions
What size of tanks does a 20 KLD electroplating / engineering ETP need?
About 55 m3 of tanks in all: oil and grease trap 1.3 m3; equalisation tank 10.2 m3; batch reactor a (neutralise 12.3 m3; batch reactor b (neutralise 12.3 m3; tube settler (hopper bottom) 6.1 m3; chlorine contact tank 1.7 m3; treated water tank 6.7 m3; sludge holding tank 4.3 m3.
How much space and power does a 20 KLD electroplating / engineering ETP need?
A plot about 17.7 x 12.6 m including the equipment room; 12.6 kW connected, 10.3 kW running, about 150 kWh a day (7.49 kWh per m3) at 16 h a day.
Does a 20 KLD electroplating / engineering ETP meet the electroplating standard (EP Rules Sch. I Sl. 9)?
Computed outlet BOD 18.5, COD 118.6, TSS 50 mg/L against the electroplating standard (EP Rules Sch. I Sl. 9) TSS 100 mg/L: within the limits. Its other parameters (pH and those listed on this page) are not computed in this estimate; checked in detailed design.
Related
Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.