This physico-chemical + MBBR effluent treatment plant for laundry is sized at a sample flow of 50 KLD. Plot about 16.5 × 16.4 m (271 m²). Power: 11.2 kW connected, about 96 kWh a day. Computed outlet meets EP Rules Sch VI general standards (inland surface water) for the parameters computed (BOD, COD, TSS, Oil & grease). Not computed here: pH, ammoniacal nitrogen, total residual chlorine and 5 more; checked in detailed design. Budget: on request.

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Design summary

ItemValue
Design flow50 KLD
Flow over running hours3.12 m³/h (16 h/day)
Flow averaged over 24 h2.08 m³/h
Technologyphysico-chemical + MBBR
Plot (footprint)16.5 × 16.4 m (271 m²)
Connected load11.2 kW
Operating load6.5 kW
Energy per day96 kWh
Energy per m³1.92 kWh/m³
Blower air (all duty blowers)83 Nm³/h
Design methodNBW practice

Treatment units and sizes

UnitPurposeVolumeSizeSizing basis
Oil and grease trapremoves floating oil and grease0.5 m³1.75 × 0.3 × 0.9 moil and grease trap at the peak inflow
Equalisation tankstores and evens out the inflow25 m³2.65 × 2.7 × 3.5 mstores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit
Neutralisation tankcorrects the pH0.6 m³0.8 × 0.8 × 1 mpH correction to 7.5
Flash mixermixes in the coagulant0.6 m³0.8 × 0.8 × 1 mcoagulant mixing
Flocculatorgrows the flocs for settling1.1 m³1 × 1.05 × 1.01 mflocculation with polyelectrolyte
Tube settler (hopper bottom)settles the chemical sludge2.8 m³0.95 × 0.95 × 3.1 mchemical sludge settling by surface loading
MBBR tank, 2 stages (sieve baffle)biological treatment: BOD and ammonia removal14 m³2 × 2 × 3.5 mlarger of 6 h on the running flow and the tank for the media needed for BOD + ammonia removal; media 5.5 m3 (39 % fill), 2 stages, fine-bubble air
Tube settler (hopper bottom)settles the biological sludge6.3 m³1.45 × 1.45 × 3 mtube settler, surface loading 0.99 m3/m2/h on the running flow, 3.0 h
Chlorine contact tankdisinfection (chlorine contact)1.1 m³0.9 × 0.35 × 3.5 mchlorine contact on the running flow
Pressure sand filter, FRP 21x62 inchremoves suspended solidsØ 0.53 m × 1.57 m high2.1 m3/h at 9.3 m/h filtration velocity
Activated carbon filter, FRP 30x72 inchremoves colour, odour and chlorineØ 0.76 m × 1.83 m high2.1 m3/h at 4.6 m/h filtration velocity
Treated water tankstores the treated water16.9 m³2.2 × 2.2 × 3.5 mtreated water storage, about 8 h of average flow
Sludge holding tankholds the excess sludge12 m³1.85 × 1.85 × 3.5 mabout 7 days of sludge, air mixed
Filter press, 470 x 470 mm, 17 chambersdewaters the sludge to cake470 mm plates, 17 chambers, 74 kg/d wet cake
Twin lobe air blowerair for aeration and mixing83 Nm3/h at 4.5 m water column, 1 working + 1 standby (serves eq, mbbr, sludge)

Tank sizes are length × width × depth; vessel sizes are diameter × height.

Water quality, stage by stage

mg/L, computed.
StageBODCODTSSNH₃-NTotal NOil & grease
Inlet300800250101050
Basket screen (inlet chamber)300800250101050
Oil and grease trap285762.4250101020
Equalisation tank285762.4250101020
Neutralisation tank285762.4250101020
Flash mixer285762.4250101020
Flocculator285762.4250101020
Tube settler (chemical sludge)285762.4100101020
MBBR bioreactor14.383.7100114
Tube settler12.178.430114
Disinfection12.178.430114
Pressure sand filter9.170.815114
Activated carbon filter5.94615114
Outlet5.94615114

Outlet vs EP Rules Sch VI general standards (inland surface water)

MoEF general standards, inland surface water (as in CPHEEO Table 5.3). Source: Cl. 5.1, Table 5.3. Applies to: inland surface water. mg/L.
ParameterLimitComputed outletResult
BOD≤ 305.9Within limit
COD≤ 25046Within limit
TSS≤ 10015Within limit
Oil & grease≤ 104Within limit

Not computed in this estimate — checked in detailed design:

  • pH 5.5-9.0
  • ammoniacal nitrogen 50 mg/L
  • total residual chlorine 1.0 mg/L
  • dissolved phosphates (as P) 5.0 mg/L
  • sulphide 2.0 mg/L
  • phenolic compounds 1.0 mg/L
  • bio-assay: 90 % survival of fish after 96 h in 100 % effluent
  • heavy metals (EP Rules Sch. VI Part A)

Design assumptions

  • Raw inlet BOD 300 mg/L
  • Raw inlet COD 800 mg/L
  • Raw inlet TSS 250 mg/L
  • Raw inlet TKN 10 mg/L
  • Raw inlet oil and grease 50 mg/L
  • Raw inlet pH 9.5
  • Raw TDS 1,500 mg/L
  • Design temperature 15–32 °C
  • Checked against: EP Rules Sch VI general standards (inland surface water)
  • Plant running 16 hours a day
  • Flow basis: about 15-25 L per kg of linen
  • Discharge assumed: inland surface water (assumed; the consent decides)
  • Inlet quality: ASSUMED typical values from published ranges for the industry; the plant is designed on the unit's own lab report
  • Note: detergent and lint; pH correction

Design checks

  • screen type: a channel bar screen reaches only 0.14 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead
  • Activated carbon filter: filtration velocity: smallest standard vessel runs below the velocity range; fine (more contact), or a smaller vessel

Engineering notes

Points our engineers confirm during detailed design:

  • alkalinity titrated: pH alone misses the carbonate / buffer alkalinity: the acid dose is a lower bound until the alkalinity is titrated

Budget

On request. Ask for a budget estimate for your site.

What quotes often exclude

  • GST
  • Land and civil building / shed
  • Site work: excavation, piling, dewatering
  • Power connection up to the plant panel
  • Consent (CTE / CTO) fees and liaison
  • Operation and maintenance after commissioning

Check your SPCB consent

The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.

Frequently asked questions

What size of tanks does a 50 KLD laundry ETP need?

About 81 m3 of tanks in all: oil and grease trap 0.5 m3; equalisation tank 25 m3; neutralisation tank 0.6 m3; flash mixer 0.6 m3; flocculator 1.1 m3; tube settler (hopper bottom) 2.8 m3; mbbr tank 14 m3; tube settler (hopper bottom) 6.3 m3; chlorine contact tank 1.1 m3; treated water tank 16.9 m3; sludge holding tank 12 m3.

How much space and power does a 50 KLD laundry ETP need?

A plot about 16.5 x 16.4 m including the equipment room; 11.2 kW connected, 6.5 kW running, about 96 kWh a day (1.92 kWh per m3) at 16 h a day.

Does a 50 KLD laundry ETP meet MoEF inland surface water?

Computed outlet BOD 5.9, TSS 15 mg/L against MoEF inland surface water BOD 30, COD 250, TSS 100 mg/L: within the limits. Its other parameters (pH and those listed on this page) are not computed in this estimate; checked in detailed design.

Related

Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.

How we calculate: our design method and sources. For a detailed quotation, request a quote.