Skip to main content

Effluent treatment plants by industry

Effluent treatment plant for pharmaceutical (formulation)

This physico-chemical + MBBR effluent treatment plant for pharmaceutical (formulation) is sized at a sample flow of 100 KLD. Plot about 20.1 × 24.2 m (486 m²). Power: 28 kW connected, about 233 kWh a day. Computed outlet meets EP Rules Sch I Sl. 73 (bulk drug and formulation) for the parameters computed (BOD, COD, TSS, Oil & grease, NH₃-N). Not computed here: pH, bio-assay and additional parameters set by the state board; checked in detailed design. Budget: on request.

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Design summary

ItemValue
Design flow100 KLD
Flow over running hours6.25 m³/h (16 h/day)
Flow averaged over 24 h4.17 m³/h
Technologyphysico-chemical + MBBR
Plot (footprint)20.1 × 24.2 m (486 m²)
Connected load28 kW
Operating load15 kW
Energy per day233 kWh
Energy per m³2.33 kWh/m³
Blower air (all duty blowers)356 Nm³/h
Design methodNBW practice

Treatment units and sizes

UnitPurposeVolumeSizeSizing basis
Oil and grease trapremoves floating oil and grease0.9 m³3.45 × 0.3 × 0.9 moil and grease trap at the peak inflow
Equalisation tankstores and evens out the inflow50.5 m³3.8 × 3.8 × 3.5 mstores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit
Neutralisation tankcorrects the pH1.1 m³1 × 1.05 × 1.01 mpH correction to 7.5
Flash mixermixes in the coagulant0.6 m³0.8 × 0.8 × 1 mcoagulant mixing
Flocculatorgrows the flocs for settling2.2 m³1.3 × 1.3 × 1.28 mflocculation with polyelectrolyte
Tube settler (hopper bottom)settles the chemical sludge5.2 m³1.3 × 1.3 × 3.1 mchemical sludge settling by surface loading
MBBR tank, 2 stages (sieve baffle)biological treatment: BOD and ammonia removal107.8 m³5.55 × 5.55 × 3.5 mlarger of 6 h on the running flow and the tank for the media needed for BOD + ammonia removal; media 42.9 m3 (40 % fill), 2 stages, fine-bubble air
Secondary clarifier (hopper bottom)settles the biological sludge25.2 m³2.9 × 2.9 × 3 mclarifier by surface loading, 6.1 h
Chlorine contact tankdisinfection (chlorine contact)2.1 m³1.35 × 0.45 × 3.5 mchlorine contact on the running flow
Pressure sand filter, FRP 30x72 inchremoves suspended solidsØ 0.76 m × 1.83 m high4.2 m3/h at 9.1 m/h filtration velocity
Activated carbon filter, FRP 36x72 inchremoves colour, odour and chlorineØ 0.91 m × 1.83 m high4.2 m3/h at 6.3 m/h filtration velocity
Treated water tankstores the treated water33.6 m³3.1 × 3.1 × 3.5 mtreated water storage, about 8 h of average flow
Sludge holding tankholds the excess sludge49.9 m³3.75 × 3.8 × 3.5 mabout 7 days of sludge, air mixed
Filter press, 630 x 630 mm, 32 chambersdewaters the sludge to cake630 mm plates, 32 chambers, 277 kg/d wet cake
Twin lobe air blowerair for aeration and mixing356 Nm3/h at 4.5 m water column, 1 working + 1 standby (serves eq, mbbr, sludge)

Tank sizes are length × width × depth; vessel sizes are diameter × height.

Water quality, stage by stage

mg/L, computed.
StageBODCODTSSNH₃-NTotal NOil & grease
Inlet1,0003,000300606020
Basket screen (inlet chamber)1,0003,000300606020
Oil and grease trap9502,85930060608
Equalisation tank9502,85930060608
Neutralisation tank9502,85930060608
Flash mixer9502,85930060608
Flocculator9502,85930060608
Tube settler (chemical sludge)9502,85910060608
MBBR bioreactor47.5314100126.21.6
Secondary clarifier40.4293.930126.21.6
Disinfection40.4293.930126.21.6
Pressure sand filter30.3265.415126.21.6
Activated carbon filter19.7172.515126.21.6
Outlet19.7172.515126.21.6

Outlet vs EP Rules Sch I Sl. 73 (bulk drug and formulation)

EP Rules 1986 Sch. I Sl. 73, bulk drug and formulation (G.S.R. 541(E), 2021). Source: Sch. I Sl. 73, subs. by G.S.R. 541(E) dated 06-08-2021 (in force 06-08-2022). Applies to: land and surface water (not for units discharging to a CETP). mg/L.
ParameterLimitComputed outletResult
BOD≤ 3019.7Within limit
COD≤ 250172.5Within limit
TSS≤ 10015Within limit
Oil & grease≤ 101.6Within limit
NH₃-N≤ 1001Within limit

Not computed in this estimate — checked in detailed design:

  • pH 6.0-8.5
  • bio-assay: 90 % survival of fish after 96 h in 100 % effluent (IS 6582)
  • additional parameters set by the state board: benzene 0.1, xylene 0.12, methylene chloride 0.9, chlorobenzene 0.2, phosphate (as P) 5, sulphide 2, phenolics 1, zinc 5, copper 3, total chromium 2, hexavalent chromium 0.1, cyanide 0.1, arsenic 0.2, mercury 0.01, lead 0.1 mg/L; SAR < 26 on land

Design assumptions

  • Raw inlet BOD 1,000 mg/L
  • Raw inlet COD 3,000 mg/L
  • Raw inlet TSS 300 mg/L
  • Raw inlet TKN 60 mg/L
  • Raw inlet oil and grease 20 mg/L
  • Raw inlet pH 7
  • Raw TDS 5,000 mg/L
  • Design temperature 15–32 °C
  • Checked against: EP Rules Sch I Sl. 73 (bulk drug and formulation)
  • Plant running 16 hours a day
  • Flow basis: varies by product and wash cycles
  • Discharge assumed: inland surface water (assumed; the consent decides)
  • Inlet quality: ASSUMED typical values from published ranges for the industry; the plant is designed on the unit's own lab report
  • Note: bulk drug (API) units with high TDS / solvents usually need ZLD; not sized here

Design checks

  • screen type: a channel bar screen reaches only 0.28 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead
  • alkalinity after nitrification (before dosing): short of alkalinity: NaHCO3 dosed to keep pH >= 6.8

Budget

On request. Ask for a budget estimate for your site.

What quotes often exclude

  • GST
  • Land and civil building / shed
  • Site work: excavation, piling, dewatering
  • Power connection up to the plant panel
  • Consent (CTE / CTO) fees and liaison
  • Operation and maintenance after commissioning

Check your SPCB consent

The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.

Frequently asked questions

What size of tanks does a 100 KLD pharmaceutical (formulation) ETP need?

About 279 m3 of tanks in all: oil and grease trap 0.9 m3; equalisation tank 50.5 m3; neutralisation tank 1.1 m3; flash mixer 0.6 m3; flocculator 2.2 m3; tube settler (hopper bottom) 5.2 m3; mbbr tank 107.8 m3; secondary clarifier (hopper bottom) 25.2 m3; chlorine contact tank 2.1 m3; treated water tank 33.6 m3; sludge holding tank 49.9 m3.

How much space and power does a 100 KLD pharmaceutical (formulation) ETP need?

A plot about 20.1 x 24.2 m including the equipment room; 28 kW connected, 15 kW running, about 233 kWh a day (2.33 kWh per m3) at 16 h a day.

Does a 100 KLD pharmaceutical (formulation) ETP meet the bulk drug and formulation standard (EP Rules Sch. I Sl. 73)?

Computed outlet BOD 19.7, TSS 15 mg/L against the bulk drug and formulation standard (EP Rules Sch. I Sl. 73) BOD 30, COD 250, TSS 100 mg/L: within the limits. Its other parameters (pH and those listed on this page) are not computed in this estimate; checked in detailed design.

Related

Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.

How we calculate: our design method and sources. For a detailed quotation, request a quote.