Effluent treatment plant for textile dyeing

This physico-chemical + MBBR effluent treatment plant for textile dyeing is sized at a sample flow of 100 KLD. Plot about 18.9 × 21.6 m (408 m²). Power: 20.8 kW connected, about 175 kWh a day. Computed outlet meets EP Rules Sch I Sl. 6 (textile) for the parameters computed (BOD, COD, TSS, Oil & grease, NH₃-N). Not computed here: pH, colour, total dissolved solids and 4 more; checked in detailed design. Budget: on request.

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Design summary

ItemValue
Design flow100 KLD
Flow over running hours6.25 m³/h (16 h/day)
Flow averaged over 24 h4.17 m³/h
Technologyphysico-chemical + MBBR
Plot (footprint)18.9 × 21.6 m (408 m²)
Connected load20.8 kW
Operating load11.4 kW
Energy per day175 kWh
Energy per m³1.75 kWh/m³
Blower air (all duty blowers)208 Nm³/h
Design methodNBW practice

Treatment units and sizes

UnitPurposeVolumeSizeSizing basis
Oil and grease trapremoves floating oil and grease0.9 m³3.45 × 0.3 × 0.9 moil and grease trap at the peak inflow
Equalisation tankstores and evens out the inflow50.5 m³3.8 × 3.8 × 3.5 mstores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit
Neutralisation tankcorrects the pH1.1 m³1 × 1.05 × 1.01 mpH correction to 7.5
Flash mixermixes in the coagulant0.6 m³0.8 × 0.8 × 1 mcoagulant mixing
Flocculatorgrows the flocs for settling2.2 m³1.3 × 1.3 × 1.28 mflocculation with polyelectrolyte
Tube settler (hopper bottom)settles the chemical sludge5.2 m³1.3 × 1.3 × 3.1 mchemical sludge settling by surface loading
MBBR tank, 2 stages (sieve baffle)biological treatment: BOD and ammonia removal46.6 m³3.65 × 3.65 × 3.5 mlarger of 6 h on the running flow and the tank for the media needed for BOD + ammonia removal; media 18.6 m3 (40 % fill), 2 stages, fine-bubble air
Secondary clarifier (hopper bottom)settles the biological sludge25.2 m³2.9 × 2.9 × 3 mclarifier by surface loading, 6.1 h
Chlorine contact tankdisinfection (chlorine contact)2.1 m³1.35 × 0.45 × 3.5 mchlorine contact on the running flow
Pressure sand filter, FRP 30x72 inchremoves suspended solidsØ 0.76 m × 1.83 m high4.2 m3/h at 9.1 m/h filtration velocity
Activated carbon filter, FRP 36x72 inchremoves colour, odour and chlorineØ 0.91 m × 1.83 m high4.2 m3/h at 6.3 m/h filtration velocity
Treated water tankstores the treated water33.6 m³3.1 × 3.1 × 3.5 mtreated water storage, about 8 h of average flow
Sludge holding tankholds the excess sludge30.5 m³2.95 × 2.95 × 3.5 mabout 7 days of sludge, air mixed
Filter press, 630 x 630 mm, 21 chambersdewaters the sludge to cake630 mm plates, 21 chambers, 183 kg/d wet cake
Twin lobe air blowerair for aeration and mixing208 Nm3/h at 4.5 m water column, 1 working + 1 standby (serves eq, mbbr, sludge)

Tank sizes are length × width × depth; vessel sizes are diameter × height.

Water quality, stage by stage

mg/L, computed.
StageBODCODTSSNH₃-NTotal NOil & grease
Inlet4001,200300303020
Basket screen (inlet chamber)4001,200300303020
Oil and grease trap3801,143.630030308
Equalisation tank3801,143.630030308
Neutralisation tank3801,143.630030308
Flash mixer3801,143.630030308
Flocculator3801,143.630030308
Tube settler (chemical sludge)3801,143.610030308
MBBR bioreactor19125.6100116.51.6
Secondary clarifier16.2117.530116.51.6
Disinfection16.2117.530116.51.6
Pressure sand filter12.1106.215116.51.6
Activated carbon filter7.96915116.51.6
Outlet7.96915116.51.6

Outlet vs EP Rules Sch I Sl. 6 (textile)

EP Rules 1986 Sch. I Sl. 6, textile industry (G.S.R. 978(E), 2016). Source: Sch. I Sl. 6, subs. by G.S.R. 978(E) dated 10-10-2016. Applies to: all modes of disposal (inland surface water, sewer, land). mg/L.
ParameterLimitComputed outletResult
BOD≤ 307.9Within limit
COD≤ 25069Within limit
TSS≤ 10015Within limit
Oil & grease≤ 101.6Within limit
NH₃-N≤ 501Within limit

Not computed in this estimate — checked in detailed design:

  • pH 6.5-8.5
  • colour 150 PCU
  • total dissolved solids (inorganic) 2100 mg/L
  • total chromium 2.0 mg/L
  • sulphide 2.0 mg/L
  • phenolic compounds 1.0 mg/L
  • sodium absorption ratio 26

Design assumptions

  • Raw inlet BOD 400 mg/L
  • Raw inlet COD 1,200 mg/L
  • Raw inlet TSS 300 mg/L
  • Raw inlet TKN 30 mg/L
  • Raw inlet oil and grease 20 mg/L
  • Raw inlet pH 9.5
  • Raw TDS 3,000 mg/L
  • Design temperature 15–32 °C
  • Checked against: EP Rules Sch I Sl. 6 (textile)
  • Plant running 16 hours a day
  • Flow basis: about 100-200 m3 per tonne of fabric dyed
  • Discharge assumed: inland surface water (assumed; the consent decides)
  • Inlet quality: ASSUMED typical values from published ranges for the industry; the plant is designed on the unit's own lab report
  • Note: colour and TDS: many states ask textile units for zero liquid discharge (RO + evaporator); not sized here

Design checks

  • screen type: a channel bar screen reaches only 0.28 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead

Engineering notes

Points our engineers confirm during detailed design:

  • alkalinity titrated: pH alone misses the carbonate / buffer alkalinity: the acid dose is a lower bound until the alkalinity is titrated
  • TDS: the assumed inlet 3000 mg/L is above the standard's 2100 mg/L; biological treatment does not remove TDS, so RO or zero liquid discharge is needed (not sized here)

Budget

On request. Ask for a budget estimate for your site.

What quotes often exclude

  • GST
  • Land and civil building / shed
  • Site work: excavation, piling, dewatering
  • Power connection up to the plant panel
  • Consent (CTE / CTO) fees and liaison
  • Operation and maintenance after commissioning

Check your SPCB consent

The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.

Frequently asked questions

What size of tanks does a 100 KLD textile dyeing ETP need?

About 198 m3 of tanks in all: oil and grease trap 0.9 m3; equalisation tank 50.5 m3; neutralisation tank 1.1 m3; flash mixer 0.6 m3; flocculator 2.2 m3; tube settler (hopper bottom) 5.2 m3; mbbr tank 46.6 m3; secondary clarifier (hopper bottom) 25.2 m3; chlorine contact tank 2.1 m3; treated water tank 33.6 m3; sludge holding tank 30.5 m3.

How much space and power does a 100 KLD textile dyeing ETP need?

A plot about 18.9 x 21.6 m including the equipment room; 20.8 kW connected, 11.4 kW running, about 175 kWh a day (1.75 kWh per m3) at 16 h a day.

Does a 100 KLD textile dyeing ETP meet the textile standard (EP Rules Sch. I Sl. 6)?

Computed outlet BOD 7.9, TSS 15 mg/L against the textile standard (EP Rules Sch. I Sl. 6) BOD 30, COD 250, TSS 100 mg/L: within the limits. Its other parameters (pH and those listed on this page) are not computed in this estimate; checked in detailed design.