Effluent treatment plants by industry
Effluent treatment plant for textile dyeing
This physico-chemical + MBBR effluent treatment plant for textile dyeing is sized at a sample flow of 100 KLD. Plot about 18.9 × 21.6 m (408 m²). Power: 20.8 kW connected, about 175 kWh a day. Computed outlet meets EP Rules Sch I Sl. 6 (textile) for the parameters computed (BOD, COD, TSS, Oil & grease, NH₃-N). Not computed here: pH, colour, total dissolved solids and 4 more; checked in detailed design. Budget: on request.
Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·
Design summary
| Item | Value |
|---|---|
| Design flow | 100 KLD |
| Flow over running hours | 6.25 m³/h (16 h/day) |
| Flow averaged over 24 h | 4.17 m³/h |
| Technology | physico-chemical + MBBR |
| Plot (footprint) | 18.9 × 21.6 m (408 m²) |
| Connected load | 20.8 kW |
| Operating load | 11.4 kW |
| Energy per day | 175 kWh |
| Energy per m³ | 1.75 kWh/m³ |
| Blower air (all duty blowers) | 208 Nm³/h |
| Design method | NBW practice |
Treatment units and sizes
| Unit | Purpose | Volume | Size | Sizing basis |
|---|---|---|---|---|
| Oil and grease trap | removes floating oil and grease | 0.9 m³ | 3.45 × 0.3 × 0.9 m | oil and grease trap at the peak inflow |
| Equalisation tank | stores and evens out the inflow | 50.5 m³ | 3.8 × 3.8 × 3.5 m | stores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit |
| Neutralisation tank | corrects the pH | 1.1 m³ | 1 × 1.05 × 1.01 m | pH correction to 7.5 |
| Flash mixer | mixes in the coagulant | 0.6 m³ | 0.8 × 0.8 × 1 m | coagulant mixing |
| Flocculator | grows the flocs for settling | 2.2 m³ | 1.3 × 1.3 × 1.28 m | flocculation with polyelectrolyte |
| Tube settler (hopper bottom) | settles the chemical sludge | 5.2 m³ | 1.3 × 1.3 × 3.1 m | chemical sludge settling by surface loading |
| MBBR tank, 2 stages (sieve baffle) | biological treatment: BOD and ammonia removal | 46.6 m³ | 3.65 × 3.65 × 3.5 m | larger of 6 h on the running flow and the tank for the media needed for BOD + ammonia removal; media 18.6 m3 (40 % fill), 2 stages, fine-bubble air |
| Secondary clarifier (hopper bottom) | settles the biological sludge | 25.2 m³ | 2.9 × 2.9 × 3 m | clarifier by surface loading, 6.1 h |
| Chlorine contact tank | disinfection (chlorine contact) | 2.1 m³ | 1.35 × 0.45 × 3.5 m | chlorine contact on the running flow |
| Pressure sand filter, FRP 30x72 inch | removes suspended solids | Ø 0.76 m × 1.83 m high | 4.2 m3/h at 9.1 m/h filtration velocity | |
| Activated carbon filter, FRP 36x72 inch | removes colour, odour and chlorine | Ø 0.91 m × 1.83 m high | 4.2 m3/h at 6.3 m/h filtration velocity | |
| Treated water tank | stores the treated water | 33.6 m³ | 3.1 × 3.1 × 3.5 m | treated water storage, about 8 h of average flow |
| Sludge holding tank | holds the excess sludge | 30.5 m³ | 2.95 × 2.95 × 3.5 m | about 7 days of sludge, air mixed |
| Filter press, 630 x 630 mm, 21 chambers | dewaters the sludge to cake | 630 mm plates, 21 chambers, 183 kg/d wet cake | ||
| Twin lobe air blower | air for aeration and mixing | 208 Nm3/h at 4.5 m water column, 1 working + 1 standby (serves eq, mbbr, sludge) |
Tank sizes are length × width × depth; vessel sizes are diameter × height.
Water quality, stage by stage
| Stage | BOD | COD | TSS | NH₃-N | Total N | Oil & grease |
|---|---|---|---|---|---|---|
| Inlet | 400 | 1,200 | 300 | 30 | 30 | 20 |
| Basket screen (inlet chamber) | 400 | 1,200 | 300 | 30 | 30 | 20 |
| Oil and grease trap | 380 | 1,143.6 | 300 | 30 | 30 | 8 |
| Equalisation tank | 380 | 1,143.6 | 300 | 30 | 30 | 8 |
| Neutralisation tank | 380 | 1,143.6 | 300 | 30 | 30 | 8 |
| Flash mixer | 380 | 1,143.6 | 300 | 30 | 30 | 8 |
| Flocculator | 380 | 1,143.6 | 300 | 30 | 30 | 8 |
| Tube settler (chemical sludge) | 380 | 1,143.6 | 100 | 30 | 30 | 8 |
| MBBR bioreactor | 19 | 125.6 | 100 | 1 | 16.5 | 1.6 |
| Secondary clarifier | 16.2 | 117.5 | 30 | 1 | 16.5 | 1.6 |
| Disinfection | 16.2 | 117.5 | 30 | 1 | 16.5 | 1.6 |
| Pressure sand filter | 12.1 | 106.2 | 15 | 1 | 16.5 | 1.6 |
| Activated carbon filter | 7.9 | 69 | 15 | 1 | 16.5 | 1.6 |
| Outlet | 7.9 | 69 | 15 | 1 | 16.5 | 1.6 |
Outlet vs EP Rules Sch I Sl. 6 (textile)
| Parameter | Limit | Computed outlet | Result |
|---|---|---|---|
| BOD | ≤ 30 | 7.9 | Within limit |
| COD | ≤ 250 | 69 | Within limit |
| TSS | ≤ 100 | 15 | Within limit |
| Oil & grease | ≤ 10 | 1.6 | Within limit |
| NH₃-N | ≤ 50 | 1 | Within limit |
Not computed in this estimate — checked in detailed design:
- pH 6.5-8.5
- colour 150 PCU
- total dissolved solids (inorganic) 2100 mg/L
- total chromium 2.0 mg/L
- sulphide 2.0 mg/L
- phenolic compounds 1.0 mg/L
- sodium absorption ratio 26
Design assumptions
- Raw inlet BOD 400 mg/L
- Raw inlet COD 1,200 mg/L
- Raw inlet TSS 300 mg/L
- Raw inlet TKN 30 mg/L
- Raw inlet oil and grease 20 mg/L
- Raw inlet pH 9.5
- Raw TDS 3,000 mg/L
- Design temperature 15–32 °C
- Checked against: EP Rules Sch I Sl. 6 (textile)
- Plant running 16 hours a day
- Flow basis: about 100-200 m3 per tonne of fabric dyed
- Discharge assumed: inland surface water (assumed; the consent decides)
- Inlet quality: ASSUMED typical values from published ranges for the industry; the plant is designed on the unit's own lab report
- Note: colour and TDS: many states ask textile units for zero liquid discharge (RO + evaporator); not sized here
Design checks
- screen type: a channel bar screen reaches only 0.28 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead
Engineering notes
Points our engineers confirm during detailed design:
- alkalinity titrated: pH alone misses the carbonate / buffer alkalinity: the acid dose is a lower bound until the alkalinity is titrated
- TDS: the assumed inlet 3000 mg/L is above the standard's 2100 mg/L; biological treatment does not remove TDS, so RO or zero liquid discharge is needed (not sized here)
Budget
On request. Ask for a budget estimate for your site.
What quotes often exclude
- GST
- Land and civil building / shed
- Site work: excavation, piling, dewatering
- Power connection up to the plant panel
- Consent (CTE / CTO) fees and liaison
- Operation and maintenance after commissioning
Check your SPCB consent
The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.
Frequently asked questions
What size of tanks does a 100 KLD textile dyeing ETP need?
About 198 m3 of tanks in all: oil and grease trap 0.9 m3; equalisation tank 50.5 m3; neutralisation tank 1.1 m3; flash mixer 0.6 m3; flocculator 2.2 m3; tube settler (hopper bottom) 5.2 m3; mbbr tank 46.6 m3; secondary clarifier (hopper bottom) 25.2 m3; chlorine contact tank 2.1 m3; treated water tank 33.6 m3; sludge holding tank 30.5 m3.
How much space and power does a 100 KLD textile dyeing ETP need?
A plot about 18.9 x 21.6 m including the equipment room; 20.8 kW connected, 11.4 kW running, about 175 kWh a day (1.75 kWh per m3) at 16 h a day.
Does a 100 KLD textile dyeing ETP meet the textile standard (EP Rules Sch. I Sl. 6)?
Computed outlet BOD 7.9, TSS 15 mg/L against the textile standard (EP Rules Sch. I Sl. 6) BOD 30, COD 250, TSS 100 mg/L: within the limits. Its other parameters (pH and those listed on this page) are not computed in this estimate; checked in detailed design.
Related
Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.
How we calculate: our design method and sources. For a detailed quotation, request a quote.