20,000 LPH industrial RO plant: sizing, power and running cost

A 20,000 LPH RO plant at 70 % recovery takes about 30,000 L/h of feed water and rejects 9,000 L/h. It uses 30 x 8 inch membranes and a 15 kW high-pressure pump. Plot about 15.5 × 15.9 m (246 m²). Power: 53.3 kW connected, about 564 kWh a day. Computed outlet meets IS 10500:2012 for the parameters computed (TDS). Budget: ₹18 L – ₹41 L (typical market range, not an NBW quotation).

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Design summary

ItemValue
Design flow320 KLD
Flow over running hours20 m³/h (16 h/day)
Flow averaged over 24 h13.33 m³/h
Plot (footprint)15.5 × 15.9 m (246 m²)
Connected load53.3 kW
Operating load35.3 kW
Energy per day564 kWh
Energy per m³1.76 kWh/m³
Design methodNBW practice

RO design

ItemValue
Product water20,000 L/h
Recovery70 %
Feed water30,000 L/h
Reject9,000 L/h
Membranes30 x 8 inch
High-pressure pump15 kW
PretreatmentMultimedia filter; RO feed dosing (SMBS, acid, antiscalant); Cartridge filter, 5 micron

Treatment units and sizes

UnitPurposeVolumeSizeSizing basis
Raw water tank (client's scope, existing)raw water storage65 m³Ø 4.1 m × 4.92 m highexisting tank, client's scope
Multimedia filter, MS 1900 mm, 4 mm FRP linedremoves turbidity and suspended solidsØ 1.9 m × 1.8 m high32.3 m3/h at 11.4 m/h filtration velocity
Cartridge filter, 5 micron: 17 x 40 inch elementsprotects the membranes (5 micron)Ø 0.64 m × 1.37 m high17 x 40 inch, 5 micron elements
RO skidremoves dissolved salts (reverse osmosis)30 x 8 inch elements in 5 pressure vessel(s), array 3:2, flux 17.1 L/m2/h, recovery 70%
Product (treated) water tankstores the treated water20 m³Ø 2.77 m × 3.32 m highHDPE tank
CIP tankmembrane cleaning3 m³Ø 1.47 m × 1.77 m highHDPE tank
CIP cartridge filter, 5 micron: 6 x 40 inch elementsmembrane cleaningØ 0.44 m × 1.37 m high6 x 40 inch, 5 micron elements

Tank sizes are length × width × depth; vessel sizes are diameter × height.

Water quality, stage by stage

mg/L, computed, compared with IS 10500:2012.
StageTDSMeets norm
Raw water1,500No
RO permeate33Yes
Outlet33Yes
Norm limit (IS 10500:2012)≤ 500

Design assumptions

  • Raw water TDS 1,500 mg/L
  • Raw water total hardness 450 mg/L as CaCO₃
  • Checked against: IS 10500:2012
  • Plant running 16 hours a day
  • Raw water: ASSUMED typical hard borewell water; the plant is designed on the site's lab report

Design checks

  • typical borewell: SIO2 not measured: needed for the membrane projection
  • typical borewell: BA not measured: needed for the membrane projection
  • typical borewell: SR not measured: needed for the membrane projection
  • typical borewell: K not measured: needed for the membrane projection

Budget

Typical market range (published figures, 2026) — not an NBW quotation

CAPEX, turnkey plant. ±30%. Excludes GST, land, civil building and site work.
CapacityRO — raw/process water
400 KLD₹18 L – ₹41 L
Running cost (O&M) per KL treated: power, chemicals, manpower, sludge and AMC/membranes. Typical market range (published figures, 2026) — not an NBW quotation.
CapacityRO — raw/process water
400 KLD₹11 – 25 per KL

These are published market figures, not Navbharat Water's prices. For our own estimate for your project, request a quote.

What quotes often exclude

  • GST
  • Land and civil building / shed
  • Site work: excavation, piling, dewatering
  • Power connection up to the plant panel
  • Consent (CTE / CTO) fees and liaison
  • Operation and maintenance after commissioning

Frequently asked questions

What does a 20000 LPH RO plant need?

30 x 8 inch membranes (array 3:2), feed 30000 L/h, reject 9000 L/h at 70 % recovery; pretreatment: multimedia filter, ro feed dosing (smbs, acid, antiscalant), cartridge filter, 5 micron.

How much space and power does a 20000 LPH RO plant need?

A plot about 15.5 x 15.9 m including the equipment room; 53.3 kW connected, 35.3 kW running, about 564 kWh a day (1.76 kWh per m3) at 16 h a day.

Does a 20000 LPH RO plant meet IS 10500:2012?

Computed outlet TDS 33 mg/L against IS 10500:2012 TDS 500 mg/L: within the limits.