Zero liquid discharge means no wastewater leaves the site: treated water is recycled and the dissolved salts are turned into solid residue by concentration and thermal evaporation. A typical train is ETP, RO, an evaporator (MEE or MVR) and a dryer (ATFD) or crystalliser. India has no blanket ZLD law; specific directions, standards and consent conditions require it.

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

What CPCB means by ZLD

CPCB's 2015 ZLD guidelines describe ZLD as facilities that allow "absolute recycling of permeate and converting solute (dissolved organic and in-organic compounds/salts) into residue in the solid form by adopting method of concentration and thermal evaporation". The guidelines are technical guidance, not a legal mandate.

How a ZLD plant works

StageWhat it does
ETP pre-treatmentRemoves suspended solids, oil, organics and hardness so the membranes and evaporator do not foul or scale.
UF / RO (often high-recovery RO)Recovers most of the water as permeate for reuse and concentrates the salts into a smaller reject stream.
Evaporator: MEE or MVRBoils the RO reject to recover more water as condensate. MEE uses steam across several effects; MVR recompresses vapour with an electric compressor.
ATFD or crystalliserDries the evaporator concentrate into solid salt or crystals.
Condensate and salt handlingCondensate is polished and reused; the dried salt is stored and sent to an authorised disposal facility.

When ZLD is required in India

InstrumentWhat it requires
CPCB direction to all SPCBs, December 2015 (Water Act s. 18(1)(b))ZLD in molasses-based distilleries, through concentration (RO/MEE) with bio-composting, or MEE with an incineration boiler.
Textile standards, EP Rules Sch I Sl. 6 (G.S.R. 978(E), October 2016), note 6CPCB, or SPCBs with CPCB approval, may mandate ZLD for large textile units in environmentally sensitive or critical areas. Treated effluent may be discharged only after exhausting reuse options.
State board and court ordersFor example, textile dyeing and bleaching clusters in Tamil Nadu operate ZLD under court and state board orders.
Environmental clearance and consent conditionsYour EC or consent to establish / operate may require ZLD even where no sector rule does. Read them first.
  • There is no single national ZLD notification covering all industries.
  • Earlier CPCB directions requiring ZLD for textile units in the Ganga basin were superseded in November 2016 by a direction to meet the notified textile standards.
  • A draft textile rule requiring ZLD above a fixed flow was not carried into the final 2016 notification.

Salt and sludge disposal

Evaporation and concentration residues (Schedule I entry 37.3) and chemical sludge from wastewater treatment (entry 35.3) are hazardous wastes under the Hazardous and Other Wastes Rules 2016. They must go to an authorised TSDF or user, can be stored on site for up to 90 days, and need Form 3 records and a Form 4 annual return to the SPCB by 30 June. Plan the salt route before you choose the evaporator.

What drives ZLD cost

Cost driverWhy it matters
Capacity and feed TDSThe evaporator is sized on the RO reject; higher TDS means more reject and a bigger, costlier evaporator.
RO recoveryEvery extra percent of RO recovery shrinks the evaporator, which is the most expensive part to build and run.
MEE vs MVRMEE needs steam (boiler or waste heat); MVR needs electricity. Fuel and power prices at your site decide which runs cheaper.
Organics and scaling saltsHigh COD, silica or hardness need extra pre-treatment and cleaning.
Salt disposalTSDF charges and transport for the dried salt are a running cost for the life of the plant.

ZLD prices vary too widely with feed TDS, recovery and site energy cost for a reliable published range, so we do not list one here. For a preliminary design and an estimate for your effluent, request a quote or see our ZLD solutions.

Rules on this page are summarised for planning and are not legal advice. Your environmental clearance and SPCB consent are the documents that bind your plant.

Frequently asked questions

Is ZLD mandatory in India?

Not for all industries. It is required by specific instruments: a CPCB direction for molasses-based distilleries, the textile standards that let CPCB or SPCBs mandate it for large units in sensitive areas, state board and court orders, and the conditions in individual clearances and consents.

What is the difference between MEE and ATFD?

An MEE (multiple-effect evaporator) concentrates the RO reject by boiling off water as condensate. An ATFD (agitated thin film dryer) takes the thick concentrate from the MEE and dries it into solid salt.

What happens to the salt from a ZLD plant?

Evaporation residues are hazardous waste under the Hazardous and Other Wastes Rules 2016 (Schedule I entry 37.3). They are stored for up to 90 days and sent to an authorised TSDF or user, with Form 3 records and a Form 4 annual return.

Is there a CPCB ZLD notification of 2016?

No single CPCB ZLD notification of 2016 covers all industries. The October 2016 textile standards (G.S.R. 978(E)) allow ZLD to be mandated for large units in sensitive areas; CPCB's 2015 ZLD guidelines are technical guidance.

Sources

  1. CPCB, Guidelines on Techno-Economic Feasibility of Implementation of Zero Liquid Discharge (ZLD) for Water Polluting Industries, January 2015.
  2. CPCB, Charter for Zero Liquid Discharge in Molasses Based Distilleries (citing the CPCB direction of 7 December 2015 under section 18(1)(b) of the Water Act).
  3. MoEFCC notification G.S.R. 978(E), 10 October 2016 (textile industry standards, EP Rules Schedule I Sl. 6).
  4. CPCB direction B-400(T)/PCI-III/2016-17, 28 November 2016, to Ganga-basin SPCBs (textile).
  5. Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 (G.S.R. 395(E), 4 April 2016), Schedule I and rules 4, 6, 8 and 20.

Related guides

Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.

How we calculate: our design method and sources. For a detailed quotation, request a quote.