What size STP does a 500-flat society need?
A 500-flat society (about 2,500 people) needs a 270 KLD MBBR STP. Plot about 25.4 × 21.9 m (556 m²). Power: 39.3 kW connected, about 320 kWh a day. Computed outlet meets NGT 2019 (O.A. 1069/2018) for the parameters computed (BOD, COD, TSS, Total N). Budget: ₹73 L – ₹1.2 Cr (typical market range, not an NBW quotation).
Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·
Design summary
| Item | Value |
|---|---|
| Design flow | 270 KLD |
| Flow over running hours | 16.88 m³/h (16 h/day) |
| Flow averaged over 24 h | 11.25 m³/h |
| Technology | MBBR |
| Flats | 500 |
| Persons | 2,500 |
| Plot (footprint) | 25.4 × 21.9 m (556 m²) |
| Connected load | 39.3 kW |
| Operating load | 20.5 kW |
| Energy per day | 320 kWh |
| Energy per m³ | 1.19 kWh/m³ |
| Blower air (all duty blowers) | 492 Nm³/h |
| Design method | NBW practice |
Treatment units and sizes
| Unit | Purpose | Volume | Size | Sizing basis |
|---|---|---|---|---|
| Equalisation tank | stores and evens out the inflow | 135.6 m³ | 6.2 × 6.25 × 3.5 m | stores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit |
| MBBR anoxic tank | removes nitrate (denitrification) | 16.9 m³ | 2.2 × 2.2 × 3.5 m | anoxic (denitrification), 1 h on the running flow; nitrate recycle 3 x |
| MBBR tank, 2 stages (sieve baffle) | biological treatment: BOD and ammonia removal | 114.7 m³ | 5.7 × 5.75 × 3.5 m | larger of 6 h on the running flow and the tank for the media needed for BOD + ammonia removal; media 45.5 m3 (40 % fill), 2 stages, fine-bubble air |
| Secondary clarifier (hopper bottom) | settles the biological sludge | 102.7 m³ | 5.85 × 5.85 × 3 m | clarifier by surface loading, 6.1 h |
| Chlorine contact tank | disinfection (chlorine contact) | 8.5 m³ | 2.7 × 0.9 × 3.5 m | chlorine contact on the running flow |
| Pressure sand filter, MS 1400 mm, 4 mm FRP lined | removes suspended solids | Ø 1.4 m × 1.8 m high | 16.9 m3/h at 11.0 m/h filtration velocity | |
| Activated carbon filter, MS 1900 mm, 4 mm FRP lined | removes colour, odour and chlorine | Ø 1.9 m × 1.8 m high | 16.9 m3/h at 6.0 m/h filtration velocity | |
| Treated water tank | stores the treated water | 90.1 m³ | 5.05 × 5.1 × 3.5 m | treated water storage, about 8 h of average flow |
| Sludge holding tank | holds the excess sludge | 24.1 m³ | 2.6 × 2.65 × 3.5 m | about 7 days of sludge, air mixed |
| Twin lobe air blower | air for aeration and mixing | 492 Nm3/h at 4.5 m water column, 1 working + 1 standby (serves eq, mbbr, sludge) |
Tank sizes are length × width × depth; vessel sizes are diameter × height.
Water quality, stage by stage
| Stage | BOD | COD | TSS | NH₃-N | Total N | Oil & grease |
|---|---|---|---|---|---|---|
| Inlet | 250 | 500 | 250 | 40 | 40 | 30 |
| Basket screen (inlet chamber) | 250 | 500 | 250 | 40 | 40 | 30 |
| Grit chamber | 250 | 500 | 250 | 40 | 40 | 30 |
| Equalisation tank | 250 | 500 | 250 | 40 | 40 | 30 |
| MBBR anoxic tank | 159.7 | 330.3 | 250 | 40 | 17.4 | 30 |
| MBBR bioreactor | 8 | 45 | 250 | 1 | 8.5 | 6 |
| Secondary clarifier | 6.8 | 42.8 | 30 | 1 | 8.5 | 6 |
| Disinfection | 6.8 | 42.8 | 30 | 1 | 8.5 | 6 |
| Pressure sand filter | 5.1 | 39.6 | 15 | 1 | 8.5 | 6 |
| Activated carbon filter | 3.3 | 25.7 | 15 | 1 | 8.5 | 6 |
| Outlet | 3.3 | 25.7 | 15 | 1 | 8.5 | 6 |
Outlet vs NGT 2019 (O.A. 1069/2018)
| Parameter | Limit | Computed outlet | Result |
|---|---|---|---|
| BOD | ≤ 10 | 3.3 | Within limit |
| COD | ≤ 50 | 25.7 | Within limit |
| TSS | ≤ 20 | 15 | Within limit |
| Total N | ≤ 10 | 8.5 | Within limit |
Design assumptions
- Raw inlet BOD 250 mg/L
- Raw inlet COD 500 mg/L
- Raw inlet TSS 250 mg/L
- Raw inlet TKN 40 mg/L
- Raw inlet oil and grease 30 mg/L
- Design temperature 15–32 °C
- Checked against: NGT 2019 (O.A. 1069/2018)
- Plant running 16 hours a day
- Flow basis: 500 flats x 5 persons x 135 L/person/day water x 0.8 to sewer = 270.0 KLD, plant 270 KLD
- Design flow rule: design flow = computed sewage flow rounded up to the next 5 KLD (minimum 10 KLD)
- Water use: water supply 135 L/person/day (CPHEEO Manual on Water Supply and Treatment 1999)
- Sewage: sewage = 80 % of water supplied (common design assumption; CPHEEO 2013 cl. 3.5 gives 40-90 %)
- Inlet quality: typical domestic sewage (CPHEEO 2013), no lab report; COD = 2 x BOD
Design checks
- screen type: a channel bar screen reaches only 0.56 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead
- alkalinity after nitrification (before dosing): short of alkalinity: NaHCO3 dosed to keep pH >= 6.8
Budget
Typical market range (published figures, 2026) — not an NBW quotation
| Capacity | STP — MBBR |
|---|---|
| 270 KLD | ₹73 L – ₹1.2 Cr |
| Capacity | STP — MBBR |
|---|---|
| 270 KLD | ₹7 – 15 per KL |
These are published market figures, not Navbharat Water's prices. For our own estimate for your project, request a quote.
What quotes often exclude
- GST
- Land and civil building / shed
- Site work: excavation, piling, dewatering
- Power connection up to the plant panel
- Consent (CTE / CTO) fees and liaison
- Operation and maintenance after commissioning
Check your SPCB consent
The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.
Frequently asked questions
What size of tanks does a STP for 500 flats (270 KLD) need?
About 493 m3 of tanks in all: equalisation tank 135.6 m3; mbbr anoxic tank 16.9 m3; mbbr tank 114.7 m3; secondary clarifier (hopper bottom) 102.7 m3; chlorine contact tank 8.5 m3; treated water tank 90.1 m3; sludge holding tank 24.1 m3.
How much space and power does a STP for 500 flats (270 KLD) need?
A plot about 25.4 x 21.9 m including the equipment room; 39.3 kW connected, 20.5 kW running, about 320 kWh a day (1.19 kWh per m3) at 16 h a day.
Does a STP for 500 flats (270 KLD) meet NGT 2019?
Computed outlet BOD 3.3, TSS 15 mg/L against NGT 2019 BOD 10, COD 50, TSS 20 mg/L: within the limits.
Related
- 300 KLD MBBR sewage treatment plant: sizes, footprint, power and budget
- STP cost per KLD in India
- STP capacity calculator
- How to calculate STP capacity
- MBBR vs SBR vs MBR
- What KLD means (KLD to LPH)
Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.