10 KLD MBBR sewage treatment plant: sizes, footprint, power and budget

This 10 KLD MBBR sewage treatment plant is sized for 16 hours of running a day. Plot about 11.8 × 13.8 m (163 m²). Power: 5.8 kW connected, about 49 kWh a day. Computed outlet meets NGT 2019 (O.A. 1069/2018) for the parameters computed (BOD, COD, TSS, Total N). Budget: ₹6 L – ₹10 L (typical market range, not an NBW quotation).

Technically reviewed by Prashant Dwivedi, Co-Founder & Director ·

Design summary

ItemValue
Design flow10 KLD
Flow over running hours0.62 m³/h (16 h/day)
Flow averaged over 24 h0.42 m³/h
TechnologyMBBR
Plot (footprint)11.8 × 13.8 m (163 m²)
Connected load5.8 kW
Operating load3.5 kW
Energy per day49 kWh
Energy per m³4.94 kWh/m³
Blower air (all duty blowers)25 Nm³/h
Design methodNBW practice

Treatment units and sizes

UnitPurposeVolumeSizeSizing basis
Oil and grease trapremoves floating oil and grease1.3 m³1.2 × 1.2 × 0.9 moil and grease trap at the peak inflow
Equalisation tankstores and evens out the inflow5 m³1.55 × 1.55 × 2.1 mstores the inflow of the 8 h a day the plant does not run, x 1.5 for peaks; air for mixing only, no treatment credit
MBBR anoxic tankremoves nitrate (denitrification)1.4 m³1.2 × 1.2 × 1 manoxic (denitrification), 1 h on the running flow; nitrate recycle 3 x
MBBR tank, 2 stages (sieve baffle)biological treatment: BOD and ammonia removal4.2 m³1.25 × 1.25 × 2.7 mlarger of 6 h on the running flow and the tank for the media needed for BOD + ammonia removal; media 1.6 m3 (39 % fill), 2 stages, fine-bubble air
Tube settler (hopper bottom)settles the biological sludge3.7 m³1.2 × 1.2 × 2.6 mtube settler, surface loading 0.43 m3/m2/h on the running flow, 6.0 h
Chlorine contact tankdisinfection (chlorine contact)1.4 m³1.2 × 1.2 × 1 mchlorine contact on the running flow
Pressure sand filter, FRP 12x52 inchremoves suspended solidsØ 0.3 m × 1.32 m high0.6 m3/h at 8.6 m/h filtration velocity
Activated carbon filter, FRP 16x65 inchremoves colour, odour and chlorineØ 0.41 m × 1.65 m high0.6 m3/h at 4.8 m/h filtration velocity
Treated water tankstores the treated water3.9 m³1.2 × 1.2 × 2.7 mtreated water storage, about 8 h of average flow
Sludge holding tankholds the excess sludge3.9 m³1.2 × 1.2 × 2.7 mabout 7 days of sludge, air mixed
Twin lobe air blowerair for aeration and mixing25 Nm3/h at 3.7 m water column, 1 working + 1 standby (serves eq, mbbr, sludge)

Tank sizes are length × width × depth; vessel sizes are diameter × height.

Water quality, stage by stage

mg/L, computed.
StageBODCODTSSNH₃-NTotal NOil & grease
Inlet250500250404030
Basket screen (inlet chamber)250500250404030
Oil and grease trap237.5476.5250404012
Equalisation tank237.5476.5250404012
MBBR anoxic tank145.9304.32504017.112
MBBR bioreactor7.343.725018.62.4
Tube settler6.241.73018.62.4
Disinfection6.241.73018.62.4
Pressure sand filter4.738.71518.62.4
Activated carbon filter325.21518.62.4
Outlet325.21518.62.4

Outlet vs NGT 2019 (O.A. 1069/2018)

NGT order 30-04-2019 (STPs). Source: Order dated 30-04-2019, para on STP standards. mg/L.
ParameterLimitComputed outletResult
BOD≤ 103Within limit
COD≤ 5025.2Within limit
TSS≤ 2015Within limit
Total N≤ 108.6Within limit

Design assumptions

  • Raw inlet BOD 250 mg/L
  • Raw inlet COD 500 mg/L
  • Raw inlet TSS 250 mg/L
  • Raw inlet TKN 40 mg/L
  • Raw inlet oil and grease 30 mg/L
  • Design temperature 15–32 °C
  • Checked against: NGT 2019 (O.A. 1069/2018)
  • Plant running 16 hours a day
  • Inlet quality: typical domestic sewage (CPHEEO 2013), no lab report; COD = 2 x BOD

Design checks

  • screen type: a channel bar screen reaches only 0.04 m/s at a buildable width: basket screen (10 mm) in a 1 x 1 m inlet chamber instead
  • alkalinity after nitrification (before dosing): short of alkalinity: NaHCO3 dosed to keep pH >= 6.8
  • Sludge transfer pump: delivery velocity (DN15): flow too small for the smallest pipe to reach 0.6 m/s; accept or run the pump on a timer at a higher velocity
  • Activated carbon filter: filtration velocity: smallest standard vessel runs below the velocity range; fine (more contact), or a smaller vessel

Budget

Typical market range (published figures, 2026) — not an NBW quotation

CAPEX, turnkey plant. ±30%. Excludes GST, land, civil building and site work.
CapacitySTP — MBBR
10 KLD₹6 L – ₹10 L
Running cost (O&M) per KL treated: power, chemicals, manpower, sludge and AMC/membranes. Typical market range (published figures, 2026) — not an NBW quotation.
CapacitySTP — MBBR
10 KLD₹30 – 50 per KL

These are published market figures, not Navbharat Water's prices. For our own estimate for your project, request a quote.

What quotes often exclude

  • GST
  • Land and civil building / shed
  • Site work: excavation, piling, dewatering
  • Power connection up to the plant panel
  • Consent (CTE / CTO) fees and liaison
  • Operation and maintenance after commissioning

Check your SPCB consent

The State Pollution Control Board consent (CTE / CTO) for your project sets the outlet limits the plant must meet, which can be stricter than the national norm. Check it before you finalise the design: STP discharge norms explained.

Frequently asked questions

What size of tanks does a 10 KLD MBBR STP need?

About 25 m3 of tanks in all: oil and grease trap 1.3 m3; equalisation tank 5 m3; mbbr anoxic tank 1.4 m3; mbbr tank 4.2 m3; tube settler (hopper bottom) 3.7 m3; chlorine contact tank 1.4 m3; treated water tank 3.9 m3; sludge holding tank 3.9 m3.

How much space and power does a 10 KLD MBBR STP need?

A plot about 11.8 x 13.8 m including the equipment room; 5.8 kW connected, 3.5 kW running, about 49 kWh a day (4.94 kWh per m3) at 16 h a day.

Does a 10 KLD MBBR STP meet NGT 2019?

Computed outlet BOD 3, TSS 15 mg/L against NGT 2019 BOD 10, COD 50, TSS 20 mg/L: within the limits.

Related

Preliminary estimate, not for construction. Detailed design and quotation by NBW engineers.

How we calculate: our design method and sources. For a detailed quotation, request a quote.